How to change classification, and what it costs

Change the classification system that structures the building model, and understand the cost of doing so before you do it.

You’re on Building and operation, in the Building card.

  1. Find the Classification field.
  2. Choose the new classification system (e.g. LCAbyg 5).
  3. Confirm: this cannot be undone without manually re-placing the constructions.

Changing classification is destructive: every construction in the building model immediately loses its classification and must be re-placed in the new structure, one by one. There is no automatic migration.

Only change classification early in a project, or be prepared to spend time re-placing the entire building model afterward.

The building model is now structured according to the new classification system, but empty of placement until the constructions are re-placed.