Limit values
Comparison against the limit values for the project’s calculation mode. Values are normalized per m²/year (reference area × assessment period).
Two separate accounts
Section titled “Two separate accounts”| Section | Content |
|---|---|
| Building | Modules A1-A3, B4, B6, C3, C4. §298, subsections 7-8 show the value after deducting energy supplements and special conditions: that is the one compared against the limit value |
| Construction process A4+A5 (§298, subsection 5) | Transport to construction site (A4) and the construction site’s consumption (A5) have their own limit value, separate from the building’s |
Each section has a chart and a table per limit value, e.g. Statutory requirement (BR25) and Voluntary class (BR25), with indicator, stage, project value, limit, unit and status.
| Status | Meaning |
|---|---|
| OK | The project is below the limit value |
| Over | The project exceeds the limit value |
| “No limit values for calculation mode” | No limit is defined for the selected mode |
Error messages to know
Section titled “Error messages to know”| Message | Cause |
|---|---|
| Missing BBR category | One or more usages are missing a BBR category: the limit value depends on it and can’t be determined until every usage has one |
| Ambiguous limit values | More than one limit value matches the same indicator/stage/role with the same specificity: a setup error in the limit values, not in the project |