How to enter emission data: a single factor or factor per year

Enter emission data for a building product correctly, depending on whether the EPD has a single value or several years.

You’re on step 3 (Emissions) in the new building product wizard, or editing an existing one.

  1. If the EPD only has one set of values, choose A single fixed factor, and enter the values per module and indicator.
  2. If the EPD has values for multiple years (e.g. a time series for energy sources), choose Factor per year:
    • Click Add year for each data point.
    • Each year may only appear once.
  3. Turn the relevant modules on/off, and fill in the values in the table.

With factor per year, the value is interpolated linearly between the entered years during calculation; outside the specified range, the nearest year is used.