Skip to content
Support
Machine-translated from Danish

Demolition, delayed start and renovation: which function should you use?

LCAbyg has several settings that resemble each other but do something different to how a building product is calculated in the building model. If the wrong one is chosen, the result can be wrong without it being obvious in the calculation.

Situation Function What it does
An existing building product is removed from the building Demolition Skips A1-A3, moves the disposal to the start year, see Demolition of existing building products
A building product is only installed later in the study period Delayed start Moves A1-A3 to the specified year, see Delayed start
An existing building product is demolished and a new one is put up later in the period Demolition + delayed start combined The disposal is moved to the delayed year, see Demolition of existing building products
A building product’s data should not count towards the result Reuse enabled Zeroes the building product’s environmental impact in every module

The renovation flag on a building product is not a marker that the building product forms part of a renovation project. It zeroes the building product’s full environmental impact, in all modules. It is therefore a different function from the project type “Renovation”, which is set on the project itself and does not affect any individual building product. A user who thinks “this is a renovation project, so I’ll set the renovation flag on everything” thereby zeroes their entire model.

Four ways to make a building product contribute nothing

Section titled “Four ways to make a building product contribute nothing”

Demolition, a delayed start beyond the study period, reuse enabled, and service life 0 (in BR23) can all four make a building product contribute nothing to the result, but they do so for entirely different reasons and suit entirely different situations. See Service life 0 and calculation mode for the last of the four.