Describe the building under Building and operation

Fill in the building’s basic data, uses and calculation settings: the foundation of the whole calculation.

You have a project with an open version. Click Building and operation in the project menu.

At the top of the page stands a key-figure band with the climate impact against the BR requirement, the reference area, the area in the operation calculation (B6) and the calculation mode. Below it stand three tables, Uses, Energy consumption in operation and Default values for technical installations, and two cards, Calculation and Building. On a wide screen the two cards sit in a column on the right, otherwise below the tables.

  1. Under Building: choose a classification (e.g. LCAbyg 5); it decides which classification system is available in the building model. Storeys above/below and further description are documentation fields and are not part of the calculation itself.
  2. In the Uses table: the project already has one use. Choose its building type and BBR category; they control default values for installations and which limit value the project must be held against. If the building has several uses, click Add use for each extra.
  3. Under Calculation: enter the calculation mode, year of commissioning and assessment period (typically 50 years, and locked to a fixed value for some calculation modes). A new project starts in the standard mode. If you switch mode, a new version is created, see How to choose calculation mode.
  4. Fill in the area columns in the Uses table: Heated, Heated basement, Storey area (100%), Garage (50%) and Balcony (25%). The app calculates the Operation (B6) and Reference area columns itself. See the box below: it is the most common pitfall on the page.
  5. Under Energy consumption in operation: add at least one energy source and enter the annual consumption.
  6. Under Default values for technical installations: tick the categories (drain, water, and heating, ventilation and cooling) where the project should use default values instead of its own constructions.

Reference area and heated floor area are two different figures with two different purposes, and both are entered on this page:

Reference areaHeated floor area
Used forThe denominator in the result (kg CO₂-eq/m²/year), and the weight between uses for mixed useMultiplier for energy consumption and default values
CompositionStorey area (100%) + garage (50%) + balconies etc. (25%)One figure
Does it enter the other?NoIs not part of the reference area
  • Documentation fields are not counted. Number of users, storeys and description are saved with the project, but do not affect the result.
  • An empty area field is not the same as 0. If a use is unheated, write 0 as its heated floor area. An empty field counts as missing, and then the limit value cannot be calculated.
  • A classification switch can take constructions out of the calculation. There is no automatic translation between two classifications, so constructions without a category in the new one do not count until you have classified them. The dialog says how many it concerns before you confirm, see How to change classification.
  • Year of commissioning is offset. Operational energy is calculated from the year after the start year.
  • Missing default values give a zero contribution. If a default value is missing for a building type, the contribution becomes zero. The table shows a warning, but the calculation continues.
  • Everything else builds on the calculation mode. Choose it wrongly, and everything below is wrong without it being visible in the result.

The building now has enough basic data, area and operational energy to move on to the building model.