Demolition of existing building products: the Ex stages and B4C
A building product marked for demolition is a product that already exists in the building at the start of the project, and which is removed as part of the project, in contrast to a product that is only installed later, see Delayed start.
A1-A3 is skipped entirely
Section titled “A1-A3 is skipped entirely”If a building product is marked for demolition, its A1-A3 (production) is not calculated at all. That makes sense: the product was not produced as part of this project, it was already there.
Disposal moves to the project’s start
Section titled “Disposal moves to the project’s start”A building product that is not demolished has its disposal (C3, C4, D) calculated in the last year of the assessment period, when its lifespan has run out. A product demolished without a delayed start instead has the disposal calculated right away, in the project’s start year, because the demolition happens right away.
Combined with delayed start
Section titled “Combined with delayed start”If a demolished building product is also set to be removed at a later time than the project’s start, i.e. a combination of demolition and delayed start, the disposal moves to the delayed year instead of the start year. If the delayed year coincides with the last year of the assessment period, the situation equals normal disposal at the end of the period.