Benchmark
Comparison of the project’s GWP against buildings from BUILD Report 2021:13 (BR18 2023) and BUILD Report 2023:21 (BR18 2025).

| Element | Meaning |
|---|---|
| Category | Filter the reference dataset, or show all buildings. To begin with, the reference group is chosen from the building’s dominant use. If the use has no reference group, all buildings are shown |
| View | Whole building (combined), embodied and operation separate, or per building element |
| Unit | Per m²/year, per m², or total |
| Chart | Bar chart or box plot |
| Percentile | Choose which percentiles the box plot shows |
| Your project | The marker for the project’s own position in the dataset |
| Median | The median of the reference dataset |
If the chosen group has few reference buildings, the page says that the statistics are uncertain. If there is no reference data for the project’s calculation mode, it says “No data for this calculation type” instead. If the project uses an assessment period other than 50 years, a note says the comparison is indicative only, because the reference dataset is normalized to 50 years.
The graph can be copied as an image or downloaded as SVG, see How to copy a graph to Word or PowerPoint.
The embodied part covers A1-A3, B4, C3 and C4. Demolition of existing building products is counted under C3 and C4, so projects with demolition are compared on the same basis as the reference buildings.
See also
Section titled “See also”- Read the result — where benchmark is first introduced