Skip to content
Support
Machine-translated from Danish

Benchmark

Comparison of the project’s GWP against buildings from BUILD Report 2021:13 (BR18 2023) and BUILD Report 2023:21 (BR18 2025).

ElementMeaning
CategoryFilter the reference dataset, or show all buildings
ViewWhole building (combined), embodied and operation separate, or per building element
UnitPer m²/year, per m², or total
ChartBar chart or box plot
PercentileChoose which percentiles the box plot shows
Your projectThe marker for the project’s own position in the dataset
MedianThe median of the reference dataset

Requires at least 5 reference data points to show statistics. If there is no reference data for the project’s calculation mode, it says “No data for this calculation type” instead.

The embodied part covers A1-A3, B4, C3 and C4. Demolition of existing building products is counted under C3 and C4, so projects with demolition are compared on the same basis as the reference buildings.