Construction site
The construction site’s consumption during the construction phase. Opened via Construction site in the project menu. At the top a key-figure band, below it a distribution card, and at the bottom the entry cards: four A5 cards and one A4 section.
If the project’s calculation mode does not count in A4 or A5, the page shows a yellow box instead of a silent 0. A4 and A5 are assessed separately: if the mode omits only one of the modules, that one is named, and the lines in that module contribute 0.
The default values on the page (construction waste, soil and materiel transport) belong to BR18 (2025). In other calculation modes the ticks have no effect, and the actual lines are summed instead.

Key figures
Section titled “Key figures”The band at the top holds the construction process against its own statutory requirement, §298(5):
| Figure | Meaning |
|---|---|
| Construction process against BR requirement | The sum A4 + A5 per m²/year against the limit value, with status Under the limit or Over the limit |
| Transport to construction site · A4 | The whole building’s A4, i.e. also the building products’ transport from the Transport page, not just materiel transport |
| Construction site · A5 | Electricity, heat, fuel, construction waste and soil |
| Basis | Reference area and assessment period, which all figures are calculated per m² per year from |
If a reference area or a BBR category is missing on a use, the band says so instead of a figure: the limit value cannot be calculated without them.
Distribution of contributions
Section titled “Distribution of contributions”The Distribution of the construction site’s contributions card shows a bar chart of the A5 sub-items and materiel transport (A4). The building products’ transport from the Transport page is not included here, only in the key figure’s A4 figure.
- Per sub-item or Per module, and scale In the building, Per m² or Per m²/year.
- Each sub-item has a method badge: Default value (fixed rate from BR18 Annex 2, table 10) or Accounted consumption (calculated from the entered lines).
- Show table and biggest contributions unfolds a table (sub-item, method, kg CO₂-eq, per m²/year, share) together with a list of the biggest individual contributions.
The sub-items are Electricity, Heat, Other energy, Fuel, Construction waste (treatment), Haulage of construction waste, Haulage of soil, Material Transport and Other.
Energy supply (A5)
Section titled “Energy supply (A5)”The construction site’s general electricity/heat supply during the construction phase.
| Field | Meaning |
|---|---|
| Comment | Free text to note where the figure comes from |
| Supply source | Energy source from the library, e.g. electricity or district heating |
| Consumption | The total consumption over the whole construction period, with the calendar year it concerns (one row per year) |
The contribution is calculated as emission factor × consumption. Electricity used for transport (electric vehicles) belongs under the transport cards, not here. Transport electricity and supply electricity are kept apart.
Fuel (A5)
Section titled “Fuel (A5)”Fuel for the construction site’s own process machinery, e.g. excavator or crane. Entered as a total quantity in litres.
Waste treatment (A5)
Section titled “Waste treatment (A5)”One waste line per material, with quantity and any transport per line. The quantity can be entered in kg or in the building product’s declared unit. The tick Use default values for haulage of construction waste is shared by all waste types:
- On: the default value in calculation mode BR18 (2025), 0.06 × reference area × duration, is applied in one go for the whole construction site, and you do not enter transport per waste type.
- Off: you enter the transport per waste type yourself, either from consumption (litres of fuel or kWh of electricity) or from mass × distance (kg·km).
Soil disposal (A5)
Section titled “Soil disposal (A5)”The same pattern as waste treatment, but with its own default value: switched on, the transport’s GWP is calculated automatically as 0.06 × reference area × duration.
Material Transport (A4)
Section titled “Material Transport (A4)”Transport of materiel to and from the construction site. Note that this is module A4, not A5, even though it sits on the Construction site page. The default value here is 0.02 × reference area × duration.