Delayed start: when A1-A3 becomes B4

Delayed start is used for a building product that is not part of the building from day one, but is only installed a number of years into the assessment period, e.g. a kitchen that is replaced or an extension built later. It is entered as a number of years, not a tick: the product’s production is postponed by exactly that number of years.

Without a delayed start, a building product’s production (A1-A3) is calculated in the project’s start year. With a delayed start of N years, the production is instead moved to year start + N, and the module changes name from A1-A3 to B4 at the same time, because it is counted as a replacement in the middle of the assessment period, in the same way as an ordinary B4 replacement.

If it lands after the end of the period, it is counted in the last year

Section titled “If it lands after the end of the period, it is counted in the last year”

If the delayed year moves the building product beyond the assessment period, i.e. after the period’s last year, the year is clipped to the period’s last year. The production is then counted as B4 in the last year, instead of the building product disappearing from the result. The disposal (C3, C4 and D) is also in the last year. No replacements occur, because the first one would fall after the period. This is the same rule as in LCAbyg 5.

If a building product is delayed or demolished, it is not transported to the construction site in the calculation (the A4 transport line contributes nothing), because it does not actually arrive at the construction site at the time an ordinary building product does.