Machine-translated from Danish
Result table
The whole result as a single tree, with one column per life cycle module. The alternative to the graphical views, and the place to find figures that are collapsed into “Other” elsewhere.

The tree
Section titled “The tree”The rows follow the calculation’s own structure, not the building model’s classification alone:
| Row | Content |
|---|---|
| Total | The building’s total result |
| Building | The building model, with each category as a collapsible branch |
| Operation (B6) | Operational energy, broken down by energy source |
| Transport to construction site (A4) | The transport contribution, e.g. terminal processes |
| Construction site (A5) | The construction site’s consumption, haulage of waste and soil, materiel transport |
The columns are the life cycle modules: A1-A3, B4, B6, C3, C4, D, A4 and A5. Demolition of existing building elements sits under C3, C4 and D. A dash means the module does not contribute for that row.
Click the name of a category, construction or building product to jump to it in the building model. If a row is part of a special condition, a badge sits by it. Hover the badge to see which ones, and click to open Special conditions.
Toolbar
Section titled “Toolbar”| Element | Meaning |
|---|---|
| Search the result table | Filters the tree to matching rows, and auto-expands the path down to each match. Overrides “Hide empty categories”, so a match is never hidden |
| Hide empty categories | Removes rows with no contribution, making the table shorter |
| Expand to | Unfolds the tree to a chosen level |
| Collapse all | Closes the whole tree |
| Export | Downloads the table, see How to export results to Excel |
Settings
Section titled “Settings”| Field | Meaning |
|---|---|
| Unit | Per m²/year, per m² or total |
| Columns | What the columns should show, e.g. GWP by module |
See also
Section titled “See also”- Modules and breakdown: the same data, graphically