Skip to content
Support
Machine-translated from Danish

How to document the construction process (A4-A5) in another tool

Take the construction process, that is transport to the construction site (A4) and the construction site itself (A5), out of the calculation in LCAbyg, because you document it in another tool.

  • The version is calculated in BR18 (2025). The checkbox only appears in calculation modes that allow it, and today that is only BR18 (2025).
  • You are on Building and operation, in the Calculation card.
  1. Tick Construction process (A4-A5) is documented in another tool.
  2. Read the confirmation and click Yes, document externally.

If you clear the tick again, it is saved immediately, without a confirmation.

  • A4 and A5 are not included in the version. The construction process requirement in § 298(5) is shown as Documented externally instead of a verdict, also in the §297 report and the Excel export.
  • The building limit (§ 298(1)) is unaffected.
  • The lines on Construction site and Transport are kept but contribute 0, and the pages say so in a notice at the top. If you clear the tick, the lines count again.

LCAbyg does not judge the construction process for the version while the tick is set. You have to provide the documentation of A4-A5 yourself in the other tool.